slide_welding_01 slide_welding_02 slide_welding_03

November 2013

The Netherlands -  Realizzation head abandoned and recovery for Saipem Portugal.

 

Carpensalda contributed to the supply of 1 Pulling Heads constructed of various sized pipe including top mounted valve assemblies and small bore piping.

Constructed from carbon steel Pipe at maximum schedules, 60mm Plate formed to specification and various sized profiled flanges.

The pulling heads were constructed to perform various functions i.e. Start up, Termination, Contingency, Abandon and Recovery.

below you can see the photo gallery of the project:

 

TPL_BEEZ5_ADDITIONAL_INFORMATION