November 2013
The Netherlands - Realizzation head abandoned and recovery for Saipem Portugal.
Carpensalda contributed to the supply of 1 Pulling Heads constructed of various sized pipe including top mounted valve assemblies and small bore piping.
Constructed from carbon steel Pipe at maximum schedules, 60mm Plate formed to specification and various sized profiled flanges.
The pulling heads were constructed to perform various functions i.e. Start up, Termination, Contingency, Abandon and Recovery.